I am a nuclear fanboy, because it is a clean and safe form of energy. But the EPR costs and building time are a tragedy for the entire sector and I have no problem in admitting that. But there are good third generation reactor like the hitachi abwr that are fast to build (less the 48 months) and relatively cheap (less than 5 billions).
The real problem is the amount of safety changes required to gen3 design after Fukushima (that was a gen2 reactor that suffered the worst earthquake and tsunami ever in the history of Japan and caused maybe a 1 single death after 4 years, just to put things in prospective).
But this is a problem in general for European nuclear. An APR-1400 costs 4.5 billion in Korea and 9 billions in Europe.
I am a nuclear fanboy, because it is a clean and safe form of energy. But the EPR costs and building time are a tragedy for the entire sector and I have no problem in admitting that. But there are good third generation reactor like the hitachi abwr that are fast to build (less the 48 months) and relatively cheap (less than 5 billions).
The real problem is the amount of safety changes required to gen3 design after Fukushima (that was a gen2 reactor that suffered the worst earthquake and tsunami ever in the history of Japan and caused maybe a 1 single death after 4 years, just to put things in prospective).
But this is a problem in general for European nuclear. An APR-1400 costs 4.5 billion in Korea and 9 billions in Europe.