• BlackLaZoR@lemmy.world
    link
    fedilink
    English
    arrow-up
    3
    ·
    6 days ago

    200 MW production line

    What is this measure ffs. Is this power consumption of the facility or solar panel capacity delivery?

    • eigenspace@feddit.org
      link
      fedilink
      English
      arrow-up
      8
      ·
      6 days ago

      Yeah, that’s sloppy writing on their part. This is a bit of industry lingo that needs to be explained in the article, and written more clearly.

      Solar panel factories are often talked about in terms of the amount of power in panels they can deliver per year, so likely what they meant to write was “production line capable of delivering 200 MW of solar panels per year”